Traditional Methods vs. BASIS
See why BASIS is the superior choice for installation timing
Install foundation and build structure same day—no concrete curing wait
Concrete foundations require multi-day timelines. Excavation and formwork typically take one day, pouring another day, then 3-7 days of curing before construction can begin on the foundation. Weather constraints can extend this further—concrete cannot be poured in rain or freezing temperatures.
BASIS posts are mechanical assemblies with no curing time. Steel reaches full load capacity immediately upon installation. Typical installation takes 3-4 hours, after which construction can begin on the foundation. Weather does not affect installation—posts can be installed and adjusted in rain or cold.
Steel posts are at full load capacity immediately. Begin construction on foundation as soon as posts are leveled and frame is placed.
Complete foundation installation in one session. No return trips for formwork removal, no waiting between stages, no extended project timeline.
Rain and freezing temperatures do not affect installation. Work proceeds on schedule regardless of weather conditions that would prevent concrete pouring.
Wrench, spirit level, and drill are sufficient. No mixer rental, no compactor, no specialized concrete finishing tools required.
One person can install foundation without coordinating helper schedules or crew availability for concrete pouring and finishing.

See why BASIS is the superior choice for installation timing
Built to handle your specific requirements
None required
Single person capable
3-4 hours
None
From people who faced similar challenges
We had a 20cm slope and were unsure of the install. BASIS system made it incredibly simple and saved us thousands.
Install foundation and begin construction same day. No curing wait, no weather delays, no multi-day coordination.